2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
11-25. DOUBLE CHECK VALVE REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut off (TM 9-2320-360-10).
Compound, Sealing, Pipe Thread (Item 15,
Parking brake on (TM 9-2320-360-10).
Wheels chocked.
Tags, Identification (Item 32, Appendix C)
Air system drained (TM 9-2320-360-10).
Locknut (Item 68, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
a. Removal
NOTE
Tag and mark hoses before removal.
(1) Remove hose no. 2665 (1) from elbow (2).
(2) Remove hose no. 2661 (3) from elbow (4).
(3) Remove hose no. 2663 (5) from fitting (6).
(4) Remove hose no. 2623 (7) from elbow (8).
(5) Remove hose no. 2664 (9) from tee (10).
(6)
Remove locknut (11), screw (12), spacer (13),
and valve (14) from right frame (15). Discard
locknut.
11-96
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |