2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
11-21. NO. 3 AIR RESERVOIR AND VALVE REPAIR (CONT)
(3) Install two fittings (4 and 5) on pressure
protection valve (13).
(4) Install fitting (4) and elbow (2) on tee (8).
(5) Install tee (8) on no. 3 air reservoir (12).
(6) Install fitting (6) on check valve (10).
(7) Install check valve (10) and fitting (7) on
tee (9).
NOTE
Check valve must point toward top of
tank for crossover hose installation
when installing tee.
(8) Install tee (9) and drain valve (11) on no.
3 air reservoir (12).
d. Installation
(1) Install four clamps (1) on battery tray (2)
with screws (3) and new locknuts (4).
11-78

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business