2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
11-14. QUICK-RELEASE VALVE REPLACEMENT (CONT)
NOTE
To install service brake quick-release
valve, do steps (12) thru (16).
(12) Install valve (9) on right frame (19) with
two screws (20) and new locknuts (21)
with aid of assistant.
(13) Install hose no. 2668 (22) on tee (7).
(14) Install hose no. 2639 (23) on tee (7).
(15) Install hose no. 2669 (24) on elbow (6).
(16) Install hose no. 2660 (25) on fitting (8).
NOTE
To install trailer brake quick-release
valve, do steps (17) thru (19).
(17) Install valve (13) on right frame (19) with
two screws (26) and new locknuts (27)
with aid of assistant.
(18) Install hose no. 2661 (28) on fitting (10).
(19) Install hose no. 2661 (28) on elbow (11).
c. Follow-On Maintenance
(1) Start engine (TM 9-2320-360-10).
(2) Build up air pressure to 120-125 psi (827-862 kPa).
(3) Shut off engine (TM 9-2320-360-10).
(4) Check for leaks.
(5) Remove wheel chocks.
11-48

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business