2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
11-5. FRONT BRAKE CHAMBER REPLACEMENT (CONT)
(4) Install slack adjuster (6), pin (7), and new
cotter pin (8) on clevis (9) of brake
chamber (2).
(5) Tighten jamnut (10) against clevis (9).
(6) Install air line (11) on brake chamber (2).
CAUTION
Screw and nut on brake chamber
clamp cannot be positioned next to
tire sidewall. Failure to comply may
result in damage to tire.
NOTE
Do steps (7) thru (9) to rotate clamp.
(7) Loosen nut (12) on screw (13).
(8) Rotate clamp (14) on bake chamber (2)
r
so nut (12) and screw (13) are positioned
away from tire sidewall.
(9) Tighten nut (12) on screw (13) to 25-30 Ib-
ft (34-40 Nm).
c. Follow-On Maintenance
(1) Start engine (TM 9-2320-360-10).
(2) Build up air pressure to 120-125 psi (827-
862 kPa).
(3) Shut off engine (TM 9-2320-360-10).
(4) Check for leaks.
(5) Remove wheel chocks.
11-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business