2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
9-8. LOCKOUT SHIFT CHAMBER REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Engine shut off (TM 9-2320-360-10).
Adhesive-Sealant (Item 4, Appendix C)
Parking brake on (TM 9-2320-360-10).
Adhesive-Sealant (item 6, Appendix C)
Wheels chocked.
Compound, Sealing, Pipe Thread (Item 15,
Tags, Identification (Item 32, Appendix C)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
Locknut (Item 52, Appendix G)
Socket Wrench Set, 3/8 In. Drive (Item 45,
Lockwashers (2) (Item 102, Appendix G)
Packing, Preformed (Item 143, Appendix G)
Wrench, Torque, 0-200 Lb-In. (Item 72,
Washers, Copper (2) (Item 179, Appendix G)
a. Removal
NOTE
Tag and mark air hoses
before
disconnecting.
(1) Remove hose no. 2769 (1) from elbow (2).
(2) Remove hose no. 2874 (3) from elbow (4).
(3) Remove plug (5) and preformed packing
(6) from lockout shift chamber (7).
Discard preformed packing.
(4) Remove locknut (8) and copper washer
(9) from stud (10). Discard locknut and
copper washer.
(5) Remove two screws (11) and lockwashers
(12) from lockout shift chamber (7).
Discard lockwashers.
NOTE
Gently strike lockout shift chamber
with soft-faced mallet to unseat from
transfer case.
(6) Remove lockout shift chamber (7) and
copper washer (13) from stud (10).
Discard copper washer.
9-21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |