2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
9-2. TWO-SPEED SHIFT LINKAGE ADJUSTMENT/REPLACEMENT (CONT)
b. Installation
(1) Route cable (2) past transmission
modulator (2.1) and transmission pan
(2.2) to transfer case (2.3).
NOTE
Yoke must be threaded on cable 0.75
in. (1.9 cm) to ensure proper yoke to
cable engagement.
(1.1) Thread lower yoke (1) on cable (2).
(2) Position upper end of cable (2) by hole in
cab floor (3).
(3) Feed cable (2) through hole in cab floor
(3).
(4) Slide grommet (4) onto cable (2).
(5) Install grommet (4) in hole in cab floor (3).
(6) Place jamnut (5), washers (6 and 7), and
jamnut (8) on cable (2).
(7) Position cable (2) in upper bracket (9).
NOTE
Threaded portion of cable should be
centered in cable bracket before
tightening jamnut.
(8) Secure cable (2) in bracket (9) with
jamnuts (5 and 8) and washers (6 and 7).
(9) Thread jamnut (10) onto cable (2).
NOTE
Cable adjustment is done on transfer
case end of cable. To ensure cable
has adequate threads on transfer
case end, thread yoke on cable 0.75
in. (1.9 cm).
(10) Install yoke (11) on cable (2).
(11) Install clevis pin (12) in yoke (11) and shift
lever (13).
(12) Install new cotter pin (14) in clevis pin
(12).
(13) Tighten jamnut (10) against yoke (11) on
cable (2).
9-4 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |