2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
b. Installation
WARNING
Pipe thread sealing compound can
burn easily, can give off harmful
vapors, and is harmful to skin and
clothing. To avoid Injury or death,
keep away from open fire and use in
well-ventilated area. If pipe thread
sealing compound gets on skin or
clothing, wash Immediately with soap
and water.
CAUTION
Use pipe thread sealing compound
sparingly only on pipe threads. Do
not apply compound to hose
connections. Damage to equipment
may result.
(1) Coat threads of elbows (1 and 2) with pipe
thread sealing compound.
(2) Install elbows (1 and 2) in sensor (3).
(3) Install sensor (3) with clamp (4), screw (5),
and new locknut (6) on stowage box (7)
with aid of assistant.
(4) Connect hose no. 2921 (8) to elbow (1).
(5) Connect hose no. 2922 (9) to elbow (2).
(6) Connect
STE-ICE
fuel
differential
pressure sensor wire (10) to connector
(11).
c. Follow-On Maintenance
(1) Close stowage box door (TM 9-2320- 360-
10).
(1) Prime fuel system (TM 9-2320-360-10).
(2) Start engine (TM 9-2320-360-10).
(3) Check fuel hoses and connections for
leaks (TM 9-2320-360-10).
(4) Shut off engine (TM 9-2320-360-10).
(5) Remove wheel chocks.
7-253
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |