2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
7-70. CTIS RELEASE VALVE REPLACEMENT (CONT)
(10) Remove power manifold (21), preformed
packing (24), preformed packing (25),
preformed packing (26), and preformed
packing (27) from porting block (28).
Discard preformed packings.
b. Installation
CAUTION
Spring in center of diaphragm in
power manifold must align with hole
in center of release valve. Failure to
comply may damage spring.
(1) Install diaphragm (1) and spring (2) on
power manifold (3).
(2) Install release valve assembly (4) on
power manifold (3) with four screws (5).
(3) Install new preformed packing (6), new
preformed packing (7), new preformed
packing (8), and new preformed packing
(9) on porting block (10).
CAUTION
The power manifold must be lowered
straight down onto the porting block
without any side movement.  Four
mounting screws are installed before
lowering manifold to prevent any side
movement.  Failure to comply may
result  in  damage  to  preformed
packings.
(4) Lower power manifold (3) on porting block
(10) and tighten four screws (5).
7-214 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business