2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(14) Install clip (22) and screw (23) on radiator
(5).
(15) Install two spacers (24), washers (25), and
new locknuts (26) on studs (21). Torque
to 110 Ib-ft (149 Nm).
(16) Install two rubber mounts (27) on hardlift
brackets (28).
NOTE
Do not use nuts on large end of
mount to tighten. Only use nuts on
small end to tighten and mushroom
mount.
(17) Install two nuts (29) and washers (30) on
tie rods (17).
(18) Install tie rods (17) in hardlift bracket (28).
(19) Remove lifting device from radiator (5).
NOTE
When  tie  rods  are  properly
installed, clearance between top of
radiator and hardlift bracket is 1.75
in. (4.45 cm).
Tie rod should be centered between
radiator and hardlift bracket.
(20) Install two washers (31), new lockwashers
(32) and nuts (33) on tie rods (17).
6-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business