Click here to make tpub.com your Home Page

Page Title: REASSEMBLY (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-2
4-4. TRANSMISSION (CONT)
b. Main Shaft and Gear Unit Assembly (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
REASSEMBLY (cont)
16
against carrier (42), as shown. Pinion set
(cont)
(28) must rotate freely and have 0.008-
0.031 inch end play. Remove carrier from
fixture
17
Shaft (4)
New lube orifice
Install
If old lube orifice plug (22)
plug (22)
was removed. Use main and
output shaft orifice in-
staller. Install small-ori-
ficed end first. Press in
until front of plug is re-
cessed 0.140-0.180 inch be-
low front end of shaft (4)
18
Center sun
Two new spring
Install
If old spring pins (9) were
gear shaft
pins (9)
removed. Split in pin must
assembly
be toward an adjacent spline
(8)
tooth. Press in until outer
end of pin (9) is flush
with, to 0.010 inch below,
top of spline teeth
4-36

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business