Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-2
3-35. BODY AND CAB MAINTENANCE (CONT)
c. Cab and Deck (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
WARNING
When using hoist to remove or install parts, be sure hoist is securely fastened to the part and that all slack in hoist is
taken up. Failure to do so could cause serious injury due to the part falling on you. If you are injured by falling
equipment, obtain medical aid immediately.
6
Tractor
Cab and deck
Lower
Position slowly and carefully
frame
so pivot pin holes are
aligned
7
Cab deck
a. Cab pivot pins
Install
Para 2-65k
NOTE
Keep cab and deck resting on wood blocks for following two steps.
b. Safety bar
Connect
c. Tilt cylinder
Connect
8
Cab
a.
Speedometer
Connect
Para 2-85
b.
Hoist
Remove
From lift sling
c.
Lift sling
Remove
Support wood beams
d.
Two wood beams
Remove
From cab
9
Cab tilt
Cab and deck
Tilt 45
pump
degrees
10
Cab and
a. Power take-off
Install
deck
cable
b. Heater lines
Connect
Para 2-73b
c. Chassis harness
Connect
Para 2-35c
d. Trailer light-
Install and
Para 2-31f
ing cable
connect
e. Ground strap
Connect
Para 2-35e
f. Fifth wheel
Connect
unlatch air
line
3-349

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business