|
|
TM 9-2320-285-24-2
3-33.
FIFTH WHEEL MAINTENANCE (CONT)
d.
Fifth Wheel Boom.
This task covers:
a
Removal
c
Inspection/Repair
b
Cleaning
d
Installation
INITIAL SETUP
Tools
Equipment Condition
No. 1 Common Organizational Maintenance
Paragraph
Condition Description
Tool Kit
Adjustable open end wrench
Parked on level surface;
Safety glasses
parking brake applied; engine
Hammer
off.
Automotive Mechanic's Tool Kit
2-78b(2)
Hydraulic lines and fittings
Punch
removed from boom.
Hammer
2-63e
Boom platform removed.
Hoist
3-42d
Hydraulic cylinders and pins
removed from boom.
Materials/Parts
3-33a
Fifth wheel unlatch cylinder
Cleaning solvent
Item 1, Appendix C
removed.
Clean cloths
Item 2, Appendix C
3-33c
Fifth wheel removed.
2-34a
Front battery removed.
Personnel Required
Two Automotive Repairers MOS 63H
References
LO 9-2320-285-12
(M878A1 Lubrication Order)
KEY
1.
Lubrication fittings (2)
2.
Locknut
3.
Washer
4.
Pivot shaft
5.
Boom
6.
Bushings (2)
3-323
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |