|
|
TM 9-2320-285-24-2
3-17.
TRANSMISSION MAINTENANCE (CONT)
c. Replacement (cont).
(1) Summary Procedure Covering Replacement (cont).
List of Tasks
Task
Task
Task
Troubleshooting
No.
Ref.
Ref. No.
(Para)
1.
Park tractor over maintenance bay
-
-
2.
Tilt cab 45 degrees
-
2-77
3.
Remove rear platform
2-65c
2-60
4.
Drain transmission fluid and remove
2-41b
2-37
dipstick
5.
Remove drive shaft
2-42
2-38
6.
Remove transmission temperature sender
2-32e
2-37
7.
Remove hoses and fittings from transmission
2-41e
2-37
8.
Remove transmission oil sampling valve
2-41j
2-37
9.
Disconnect battery ground cable
2-34a
2-18
10.
Remove hydraulic pump (lines still
3-42a
3-40
connected)
11.
Remove power take-off
3-42b
3-40
12.
Disconnect gear shift linkage and lever
2-41g(1)
2-37
13.
Remove shift lockout cylinder
2-41h(1),
2-37
2-41h(2)
14.
Disconnect modulator cable
2-41i
2-37
15.
Disconnect speedometer cable; remove
2-85
2-81
adapter and gear assembly
16.
Remove rear cab guard
2-65d
2-60
17.
Remove water level sensor
2-29
2-19
18.
Remove transmission dipstick tube
2-41k
2-37
19.
Remove transmission mount
3-17f
3-14
3-110
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |