|
|
TM 9-2320-285-24-2
13-12. WIRING HARNESS MAINTENANCE (CONT)
c. Instrument Panel Harnesses (cont).
(2). Right Corner Panel Harness (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
NOTE
Perform step 5 below only if new right corner panel harness (2) is being installed.
5
New right
Four light sockets
a. Strip
Strip 1/4 inch insulation
corner
(3)
from wire ends
panel har-
b. Connect
To right corner panel harness
ness (2)
leads as shown with crimp
connectors (4)
6
Cab
Right corner panel
Position
harness (2)
7
Instrument
a.
Ammeter light
Install
Para 2-26d(1)
panel,
socket
underside
b.
WATER LEVEL,
Install
Para 2-26b(4)
WATER TEMP,
OIL PRESSURE,
and LOW AIR
warning light
sockets (3)
c.
Three flood
Connect
Para 2-26a(6)
light switch
electrical
leads
d.
Six connectors
Connect
To three diodes, para
(1)
2-35f
e.
Two water level
Connect
Para 2-26c(1)
warning bell
electrical
leads
8
Cab
Right corner panel
Connect
Para 2-35c(2)
harness (2)
connectors
9
Cab tilt
Cab Lower
To normal operating position
pump
10
Battery
Battery ground
Connect
Para 2-34a.
box
cable
3-81
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |