TM 9-2320-285-24-2
3-9. ALTERNATOR MAINTENANCE (CONT)
STEP
LOCATION
ITEM
ACTION
REMARKS
TESTING
11
a.
Field coil (21) Test
Using ohmmeter check:
a. For grounds. Connect ohmmeter between one field
coil lead and housing (sequence A as shown).
Field coil is grounded if reading is low
b. For opens. Connect ohmmeter between two field
coil leads (sequence B as shown). Field coil is
open if ohmmeter reading is high or infinite
c. For short circuits. Connect ohmmeter between two
field coil leads (sequence B as shown).
Winding is shorted if ohmmeter reading is less
than 0.2 ohms. Replace field coil if defective
Using ohmmeter connect prod
to grounded heat sink and base of
one of the three terminals as
shown.
Observe
reading.
Reverse prods. Observe reading.
If readings are identical, replace
rectifier bridge. Repeat procedure
with remaining two terminals.
Connect prods to insulated heat
sink and one of three terminals.
Observe reading. Reverse prods.
Observe reading. If readings are
identical, replace rectifier bridge.
Repeat procedure with each of
two remaining terminals
3-42
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |