|
|
TM 9-2320-285-24-1
2-63. FRAME AND TOWING ATTACHMENTS MAINTENANCE (CONT)
e.
Boom Platform and Latch Assembly.
This task covers:
a. Removal
c. Inspection
b. Cleaning
d. Installation
INITIAL SETUP:
Tools
Personnel Required
Flat tip screwdriver, 1/8 inch
Wheel Vehicle Mechanic MOS 63B
Socket wrench set, 3/8 inch drive
Screw threading set
Equipment Condition
Welding shop equipment
Paragraph
Condition Description
Air compressor
Vehicle parked on level
Materials/Parts
surface, engine off, and
Cleaning solvent
Item 1, Appendix C
parking brake applied.
Clean cloths
Item 2, Appendix C
Detergent
Item 27, Appendix C
STEP
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
1
Boom
a. Two latches (8)
Pull up and
assembly,
away from
rear
latch bracket
(4)
b. Boom platform
Lift back end,
(1)
pull out, and
remove
NOTE
Don't perform the following steps unless inspection indicates replacement
of latch assemblies is necessary.
2
Boom
a. Four capscrews
Remove
Support latch brackets (4)
platform
(2) and lock-
(1)
nuts (3)
b. Two latch
Remove
brackets (4)
3
Boom tie
a. Two cotter
Remove
plate
pins (5)
b. Two washers
Remove
(6)
c. Two shafts (7)
Remove
Support latches (8)
d. Two latches (8)
Remove
e. Four screws
Remove
Support pivot brackets (11)
(9) and lock
washers (10)
2-691
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |