|
|
TM 9-2320-285-24-1
2-35.
WIRING HARNESS MAINTENANCE (CONT)
d.
Engine Harness (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSPECTION/REPAIR (cont)
2
e. Engine harness
Inspect: repair if insulation frayed or con-
(cont)
(6)
ductor broken. Wrap electrical tape over
frayed insulation. If broken conductor is
accessible, cut a length of same gage wire
and splice using insulated splice connec-
tor; if wire is not accessible, replace
harness (notify direct support
maintenance)
TESTING
3
Engine and
a. Engine harness
Test continuity: use multimeter set to X1
frame rails
(6)
ohms range (refer to electrical system
wiring schematic); refer to step 2e above
for repair of broken conductor
b. Front chassis
Connect
Slide into tracks in chassis
and right
harness connector (4)
instrument
panel plugs
c. Connectors
Connect
As tagged; tighten capscrew
(1 thru 4)
(5)
4
Battery
Battery ground
Connect
box
cable
5
Left hand
Heat shield
Install
frame rail
6
Cab tilt
Cab
Lower
To normal operating
position
pump
7
Cab
a. Key switch
Turn on
b. Lights,
Check operation: if lights, controls, or
controls, and
indicators do not operate, refer to para
indicators
2-17 thru 2-23 for troubleshooting
procedures
c. Key switch
Turn off
2-411
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |