TM 9-2320-285-24-1
2-26.
INSTRUMENT PANEL MAINTENANCE (CONT)
g.
Instrument Panels (cont).
(3)
Right Panel. This task covers replacement of the right instrument panel.
INITIAL SETUP
Tools
Equipment Condition
No. 1 Common Organizational Maintenance
Paragraph
Condition Description
Tool Kit
Screwdriver
Parked on level surface,
Safety glasses
engine off, and parking brake
applied.
Materials/Parts
2-34a
Battery ground cable
Cleaning solvent
Item 1, Appendix C
disconnected.
Clean cloths
Item 2, Appendix C
2-41h(l)
All air pressure relieved.
2-26d(2)
Dash light removed.
Personnel Required
2-41g(2)
Fifth wheel and gear shift con-
Wheel Vehicle Mechanic MOS 63B
trol mounting plate removed.
3-33b
Fifth wheel unlatch valve
removed.
3-24a
Brake air control valve
removed.
3-12d
Right instrument panel wiring
harness removed.
2-284
|