TM 9-2320-285-24-1
2-26.
INSTRUMENT PANEL MAINTENANCE (CONT)
g. Instrument Panels.
(1) Front Panel.
This task covers:
a. Raising panel
e. Inspection
b. Removal
f. Reassembly
c. Disassembly
g. Installation
d. Cleaning
h. Securing panel
INITIAL SETUP
Tools
Equipment Condition
No. 1 Common Organizational Maintenance
Paragraph
Condition Description
Tool Kit
Screwdriver
Parked on level surface,
Safety glasses
engine off, and parking brake
applied.
Materials/Parts
2-34a
Battery ground cable
Cleaning solvent
Item 1, Appendix C
disconnected.
Clean cloths
Item 2, Appendix C
2-85
Speedometer cable nut and
housing removed from
Personnel Required
speedometer.
Two Wheel Vehicle Mechanics MOS 63B
2-276
|