|
|
TM 9-2320-285-24-1
2-26. INSTRUMENT PANEL MAINTENANCE (CONT)
b.
Indicator Lights (cont).
(2) TRANS/TORQUE CONVERTER Light.
This task covers:
a. Removal
c. Inspection
b. Cleaning
d. Installation
INITIAL SETUP:
Tools
Equipment Condition
No. 1 Common Organizational Maintenance
Paragraph
Condition Description
Tool Kit
Safety glasses
Vehicle parked on level
Automotive electrical tool kit
surface, engine off, and
parking brake applied.
Materials/Parts
2-26g(1)
Instrument panel raised.
Cleaning solvent
Item 1, Appendix C
2-34a
Battery ground cable
Clean cloths
Item 2, Appendix C
disconnected.
Personnel Required
Wheel Vehicle Mechanic MOS 63B
KEY
1.
Socket
2.
Bulb
3.
Nut
4.
Lock washer
5.
Housing
6.
Washer
2-247
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |