Click here to make tpub.com your Home Page

Page Title: INSPECTION (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-26. INSTRUMENT PANEL MAINTENANCE (CONT)
a. Switches (cont).
(6) Flood Light Switches (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
INSPECTION (cont)
5
c. All other parts
Inspect
Replace if cracked, broken,
(cont)
or threads damaged
INSTALLATION
6
Switches
Three nuts (8)
Install
On three switches
(7, 10,
(7, 10, and 12)
and 12)
7
Cab,
a. Two electrical
Position
BRN/WHT lead (5) on center
underside
leads
post of switch (12)
(5 and 11)
b. Two screws (2)
Install and
On switch (12)
and washers
tighten
(3)
c. Two electrical
Position
BRN/WHT lead (5) on center
leads
post of switch (10)
(5 and 9)
d. Two screws (2)
Install and
On switch (10)
and washers
tighten
(3)
e. Three electri-
Position
BRN/WHT leads (4 and 5) on
cal leads
center post of switch (7)
(4 thru 6)
f. Two screws (2)
Install and
On switch (7)
and washers
tighten
(3)
g. Three switches
Position
In holes in corner instrument
(7, 10, and
panel
12)
8
Cab tilt
Cab
Lower
To normal operating position
pump
9
Corner
Three nuts (1)
Install and
Rotate clockwise. Have
instrument
tighten
assistant located under
panel
hood to hold switches
stationary while nuts (1)
are tightened with pliers
10 Battery
Battery ground
Connect
box
cable
2-233

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business