Click here to make tpub.com your Home Page

Page Title: Flood Light Switches
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-285-24-1
2-26. INSTRUMENT PANEL MAINTENANCE (CONT)
a. Switches (cont).
(6) Flood Light Switches.
This task covers:
a. Removal
c. Inspection
b. Cleaning
d. Installation
INITIAL SETUP
Tools
Personnel Required
No. 1 Common Organizational Maintenance
Wheel Vehicle Mechanic MOS 63B
Tool Kit
Screwdriver
Equipment Condition
Safety glasses
Paragraph
Condition Description
Pliers, slip joint
Vehicle parked on level
Materials/Parts
surface, engine off, and
Cleaning solvent
Item 1, Appendix C
parking brake applied.
Clean cloths
Item 2, Appendix C
2-34a
Battery ground cable
Tags
Item 14, Appendix C
disconnected.
KEY
1.
Chrome nuts (3)
2.
Screws (6)
3.
Washers (6)
4.
Electrical lead (BRN/WHT)
5.
Electrical lead (BRN/WHT)
6.
Electrical lead (YEL/RED)
7.
Switch
8.
Nuts (3)
9.
Electrical lead (GRN/RED)
10.
Switch
11.
Electrical lead (YEL/BLU)
12.
Switch
2-230

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business