|
|
TM 9-2320-285-24-1
2-13.
FUEL SYSTEM MAINTENANCE (CONT)
d. Quick Start (cont).
STEP
LOCATION
ITEM
ACTION
REMARKS
REASSEMBLY/INSTALLATION (cont)
7
c. Bracket (26)
Position On bracket (33)
(cont)
d. Two capscrews
Install and
(25) and
tighten
locknuts (24)
e. Cap (35)
Install
Route cap chain through hole
in bracket (26)
f. Clip (34)
Install
On end of cap (35) chain;
secures cap (35) to
bracket (36)
g. Terminal (28)
Install
On wire (27) if new valve
(22) is being installed.
Strip 1/4 inch insulation
from wire (27) and crimp
terminal to wire securely
h. Ether valve
Position
On bracket (26)
(22)
i. Bracket (21)
Position
j. Ground wire
Position
On capscrew (20)
(27) termi-
nal (28)
k. Two capscrews
Install and
(20)
tighten
8
Air inlet
a. Atomizer (19)
Install
In air inlet housing;
housing,
tighten
right side
b. Tube (15)
Route between atomizer (19) and control
valve (16). Connect to atomizer
c. Tie strap (14)
Install
Around fuel and air lines to
secure tube (15)
9
Thermostat
a. Bushing (18)
Install and
housing,
tighten
left side
b. Elbow (17)
Install and
Connect adjacent fuel line
tighten
c. Control valve
Install and
(16)tighten
d. Two tubes (12
Route and
and 15)
connect
e. Tie straps (11)
Install
Secures tube (12) to exist-
ing lines
2-102
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |