|
|
TM 9-2320-270-20-3
HEATER CONTROL PANEL - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
28. Heater control
Switch (22)
Push through.
panel (2)
29. Switch (22)
Nut (23)
Screw on and tighten using 9/16-inch
wrench.
NOTE
FOLLOW-ON MAINTENANCE:
1. Check operation (TM 9-2320-270-10).
2. Install optical ribbon and bezels (page 4-476).
3. Connect battery ground cable (page 4-444).
TASK ENDS HERE
TA240824
4-1311
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |