Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
HEATER SHUTOFF VALVE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
15. Oil cooler
Nipple (5)
a. Wrap threads with teflon tape
assembly (4)
(page 4-1).
b. Screw in but do not tighten.
16. Nipple (5)
Elbow (3)
Screw on and tighten using pipe wrench.
17. Elbow (3)
Reducer (1)
a.
Wrap threads with teflon tape
(page 4-1).
b.
Screw in and tighten using 1 1/16-
inch wrench.
18. Reducer (1)
Valve (2)
a.
Wrap threads with teflon tape
(page 4-1).
b.
Screw in and tighten using 11/16-
inch wrench.
19. Valve (2)
Hose (6)
Lube lightly with soap and push on
until seated.
TA240821
4-1305

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business