|
|
TM 9-2320-270-20-3
WIPER VENT LINES - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
Push on.
Vent line (2)
18. Check valve (1)
Using pressure sensitive tape, tape
Check valve (1)
19. Vent line (2)
together.
Push through.
Vent line (2)
20. Grommet (3)
Put on.
New loop clamp (5)
21. Screw (4)
Screw on and tighten using 3/8-inch
Nut (7)
22. Loop clamp (5) to
wrench.
dashboard (6)
Using slip-joint pliers, put on.
Loop clamp (5)
23. Vent line (2) and
other air lines and
wires (8)
Using slip-joint pliers, put on.
New tie wraps (9)
24.
Put in place.
Right inner roof
25. Side rail (10)
panel (11)
TA240763
4-1224
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |