Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
WIPER AIR LINES - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
Put in place.
Right inner roof
40. Side rail (1)
panel (2)
Screw in and tighten using number two
Six screws (3)
41. Right inner roof
cross-tip screwdriver.
panel (2) to side
rail (1)
Put in place.
Left inner roof
42. Side rail (4)
panel (5)
Screw in and tighten using number two
Five screws (6)
43. Left inner roof
cross-tip screwdriver.
panel (5) to side
rail (4)
Put in place.
Air horn valve (7)
44. Left inner roof
panel (5)
Screw in and tighten using 5/16-inch soc-
Two screws (8)
45. Air horn valve (7)
ket and handle.
to side rail (4)
Put on.
Air horn chain (10)
46. Screw (9)
Screw in and tighten using number two
Screw (9)
47. Air horn chain (10)
cross-tip screwdriver.
to side rail (4)
TA240758
4-1218

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business