|
|
TM 9-2320-270-20-3
LATCHES, LATCH MOUNTING BRACKETS, AND CATCHES - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
LATCH INSTALUTION - CONTINUED
Put on.
Latch (2)
29. Mount (1)
Put in.
Pin (3)
30. Latch (2) to
mount (1)
New cotter pin (4)
Put in.
31. Pin (3)
Latch.
Latch (2)
32 Catch (5)
TASK ENDS HERE
INSULATION
This task covers:
a. Removal (page 4-1115)
b. installation (page 4-1115)
lNITIAL SETUP
Materials/Parts Continued
Tools
insulation, side panel (L. H.)
Brush, acid swabbing
insulation, side panel (R. H.)
Knife, putty
insulation, side panel door (R. H.)
Materials/Parts
Personnel Required
Adhesive (item 1, appendix C)
One
insulation, hood (C. H.)
insulation, hood (R. H.)
TA240697
4-1114
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |