|
|
TM 9-2320-270-20-3
TOWING PINTLE
This task covers:
a. Removal (page 4-1046)
c. Assembly (page 4-1048)
d. Installation (page 4-1050)
b. Disassembly (page 4-1047)
INITIAL SETUP
Tools Continued
Tools
Bar, pry
Socket, 1 1/2-inch,
l-inch drive
Chisel, cold hand, 1/2-inch
Socket, 2 1/4-inch,
l-inch drive
Vise
Drill, electric, portable
Drill twist, 3/16-inch
Wrench, open-end,
1 1/8-inch
Wrench, open-end,
1 1/2-inch
Extension, 10-inch, 1/2-inch drive
Extension, 10-inch, l-inch drive
Materials/Parts
File, flat
Gun, grease
Cotter pin, lock slotted nut
Hammer, machinist's ball-peen
Cotter pin, S-link
Handle, ratchet, 1/4-inch drive
Cotter pin, slotted nut
Handle, ratchet, 1/2-inch drive
Grease (LO 9-2320-270-12)
Handle, ratchet, 1-inch drive
Screw, drive
Pliers, slip-joint, straight-nose
Punch, drive-pin, 1/8-inch
Personnel Required
Punch, drive-pin, tapered, 5/16-inch
Socket, 5/16-inch, 1/4-inch drive
Two
Socket, 1 1/8-inch, 1/2-inch drive
4-1045
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |