Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
POWER STEERING RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION - CONTINUED
Fill with fluid to full mark.
Power steering
61.
reservoir (1)
a. Start and idle for 10 minutes
Engine
62.
(TM 9-2320-270-10).
b. Check for leaks.
Turn lock-to-lock four times.
Steering wheel
63.
Check fluid level and add fluid if
Power steering
64.
necessary.
reservoit (1)
Put in and tighten.
Oil level gage (2)
65.
Shut down (TM 9-2320-270-10).
Engine
66.
NOTE
FOLLOW-ON MAINTENANCE: Close left side of hood (TM 9-2320-270-10).
TASK ENDS HERE
TA240646
4-1034

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business