|
|
TM9-2320-270-20-2
TANDEM AXLE HUB, DRUM, AND BEARING ASSEMBLY
This task covers:
a. Removal (page 4-926)
d. Inspection/Replacement (page 4-929)
b. Disassembly (page 4-928)
e. Assembly (page 4-932)
c. Cleaning (page 4-928)
f. Installation (page 4-933)
INITIAL SETUP
Tools
Tools Continued
Adapter, grease gun coupling, rigid
Woodboards, 4 inch by 4 inch by 48 inch
Brush, parts cleaning
(two required)
Wrench, axle nut
Chisel, 1/4-inch
Drift, brass, 3/4-inch
Extension, 6-inch, 1/2-inch drive
Materials/Parts
Hammer, machinist's ball-peen
Hammer, 10-pound, cross-peen
Grease, tandem axle wheel bearing
Handle, ratchet, 1/2-inch drive
(LO 9-2320-270-12)
Handle, wheel nut wrench
Lockwasher, spindle
Lubricant packer, bearing
Rags, wiping (item 10, appendix C)
Lubricating gun, hand
Seal, oil, hub
Pliers, slip-joint
Solvent, cleaning (item 16, appendix C)
Puller, mechanical, slide hammer
Socket, 1/2-inch, 1/2-inch drive
Personnel Required
Socket, 9/16-inch, 1/2-inch drive
Trestle, motor vehicle maintenance,
Two
10 ton (two required)
Truck, lift, wheel
Equipment Condition
Woodblock, 4 inch by 4 inch by
12 inch
Axle shaft removed (page 4-603)
Spring brake caged (TM 9-2320-270-10)
Wheels removed (TM 9-2320-270-10).
4-925
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |