|
|
TM 9-2320-270-20-2
TOWING KIT QUICK RELEASE VALVE - CONTINUED
ACTION
ITEM
LOCATION
REMARKS
CLEANING
All parts
Clean according to general maintenance
18.
instructions (page 4-1).
INSPECTION/REPLACEMENT
All parts
Inspect according to general maintenance
19.
instructions (page 4-1).
ASSEMBLY
Valve (2)
20. Bracket (1)
a. Secure bracket (1) in vise.
b. Place in position.
Two screws (3), new
Screw on and tighten using 1/2-inch box
21. Valve (2) to
Iockwashers (4),
wrench, 1/2-inch socket, and handle.
bracket (1)
and nuts (5)
Elbow (6)
Wrap threads with teflon tape
a.
22. Valve (2)
(page 4-1).
Screw in and tighten using 5/8-inch
b.
wrench.
Elbow (7)
23.
Wrap threads with teflon tape
a.
(page 4-1).
Screw in and tighten using 7/8-inch
b.
wrench.
Reducer (8)
Wrap threads with teflon tape
24.
a.
(page 4-1).
Screw in and tighten using 1 1/16-inch
b.
wrench.
Stoplight switch (9)
Wrap threads with teflon tape
25. Reducer (8)
a.
(page 4-1).
b.
Screw in and tighten using 3/4-inch
wrench.
Two inserts (10)
26. Two elbows
Push in and using plastic hammer, seat.
a.
Take bracket (1) out of vise.
b.
(6) and (7)
INSTALLATION
Valve (2) and
Place in position.
27. Trailer connector
bracket (1)
bracket (11)
4-832
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |