|
|
TM 9-2320-270-20-2
PTO CONTROL VALVE - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
CLEANING
Clean according to general maintenance
All parts
13.
instructions (page 4-1).
lNSPECTION/REPLACEMENT
Inspect according to general maintenance
All parts
14.
instructions (page 4-1).
ASSEMBLY
a. Secure valve (1) in vise.
Plug (2)
15. Control valve (1)
b. Wrap threads with teflon tape
(page 4-1).
c. Screw in and tighten using 3/16-inch
key.
a. Wrap threads with teflon tape
Elbow (3)
16.
(page 4-1).
b. Screw in and tighten using 9/16-inch
wrench.
a. Wrap threads with teflon tape
Adapter (4)
17.
(page 4-1).
b. Screw in and tighten using 9/16-inch
wrench.
a. Push in and using plastic hammer, seat.
Two inserts (5)
18. Elbow (3) and
b. Remove valve (1) from vise.
adapter (4)
INSTALLATION
Place in position.
Control valve (1)
19. Dashboard (6)
Screw in and tighten using cross-tip
Two screws (7)
20. Control valve (1) to
screwdriver.
dashboard (6)
Lube end lightly with soap and push in
Air line 691 (8)
21. Elbow (3)
until seated.
Screw on and tighten using 5/8-inch
Nut (9)
22. Air line 691 (8) to
wrench.
elbow (3)
4-768
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |