Click here to make tpub.com your Home Page

Page Title: CLEANING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-2
TREADLE VALVE - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
CLEANING
Clean according to general maintenance
All parts
36.
instructions (page 4-1).
INSPECTION/REPLACEMENT
Inspect according to general maintenance
All parts
37.
instructions (page 4-1).
ASSEMBLY
a. Secure tee (1) in vise.
Nipple (2)
38. Tee (1)
b. Wrap threads with teflon tape
(page 4-1).
c. Screw in and tighten using 11/16-inch
wrench.
d. Take tee (1) out of vise.
Push in place.
Pedal stop (4)
39. Treadle valve (3)
Put in place.
Roller (6)
40. Pedal (5)
Push in.
Roller pin (7)
41. Roller (6) to
pedal (5)
Using long-nose pliers, put in.
New cotter pin (8)
42. Roller pin (7) to
pedal (5)
Put in place and hold.
Pedal (5)
43. Treadle valve (3)
Push in and line up holes.
Hinge pin (9)
44. Pedal (5) to
treadle valve (3)
Using ball-peen hammer, tap in.
Hollow pin (10)
45. Pedal (5) to hinge
pin (9)
INSTALLATION
Put in position.
Treadle valve (3)
46. Toe board (11)
Screw in and tighten with help of assis-
Three screws (12),
47. Treadle valve (3)
tant, using 1/2-inch wrench, socket, and
three new lock-
to toe board(11)
handle.
washers (13), and
Notice that one screw is put in from
nuts (14)
bottom.
4-726

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business