|
|
TM9-2320-270-20-2
SECONDARY AIR RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION
Put in place.
Two bracket arms (2)
49. Reservoir
and spacers (3)
support (1)
Screw in and tighten using 9/16-inch box
Two screws (4),
50. Two bracket arms (2)
wrench, socket, and handle.
Iockwashers (5),
to reservoir
and nuts (6)
support (1)
Place in position to connect lines
Secondary
51.
reservoir (7)
(8 and 9).
Air line 536 (9)
Lube end lightly with soap and push in
52. Elbow (10)
until seated.
Nut (11)
Screw on and tighten using 15/16-inch
53. Air line 536 (9)
wrench.
to elbow (10)
Air line 635 (8)
Lube end lightly with soap and push in
54. Elbow (12)
until seated.
Nut (13)
Screw on and tighten using 15/16-inch
55. Air line 635 (8)
wrench.
to elbow (12)
Push up into place.
Secondary
56. Two bracket
reservoir (7)
arms (2)
Two bracket arms (2)
Position around reservoir (7).
57.
Two thru-bolts (14),
Screw on and tighten using 9/16-inch box
56.
new Iockwashers
wrench, socket, and handle.
(15), and nuts (16)
Air line 003 (18)
Lube end lightly with soap and push in
59. Elbow (17)
until seated.
Nut (19)
Screw on and tighten using 1 1/8-inch
60. Air line 003 (18) to
wrench.
elbow (17)
4-684
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |