Click here to make tpub.com your Home Page

Page Title: ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
SECONDARY AIR RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
ASSEMBLY
NOTE
Skip steps 36 thru 43 if parts were not disassembled.
a.
Secure check valve (1) in vise.
Bushing (2)
36. Check valve (1)
Wrap threads with teflon tape
b.
(page 4-1).
c.
Screw on and tighten using 1 1/16-inch
wrench.
a.
Wrap threads with teflon tape
Street elbow (3)
37. Bushing (2)
(page 4-1).
Screw on and tighten using pipe wrench.
b.
Wrap threads with teflon tape
a.
Elbow (4)
36. Check valve (1)
(page 4-1).
Screw on and tighten using 1 1/16-inch
b.
wrench.
Take check valve (1) out of vise.
c.
Secure tee (1) in vise.
a.
New nipple (6)
39. Tee (5)
Wrap threads with teflon tape
b.
(page 4-1).
c.
Screw in.
a.
Wrap threads with teflon tape
Adapter (7)
40.
(page 4-1).
Screw in and tighten using 1 1/16-
b.
inch wrench.
a.
Wrap threads with teflon tape
Check valve (8)
41. Adapter (7)
(page 4-1).
b.
Screw in and tighten using 1 3/8-inch
wrench.
Wrap threads with teflon tape
a.
Elbow (9)
42. Check valve (8)
(page 4-1).
Screw in and tighten using 7/8-inch
b.
wrench.
a.
Wrap threads with teflon tape
Adapter (10)
43. Tee (5)
(page 4-1).
b.
Screw in and tighten using 1 1/8-inch
wrench.
Take tee (5) out of vise.
c.
4-682

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business