Click here to make tpub.com your Home Page

Page Title: ASSEMBLY cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
PRIMARY AIR RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
Wrap threads with teflon tape
a.
Elbow (2)
20.
(page 4-1).
Screw in and tighten using 1 1/16-inch
b.
wrench.
Wrap threads with teflon tape
a.
Drain valve (5)
21. Primary
(page 4-1).
reservoir (4)
Screw in and tighten using 9/16-inch
b.
wrench.
Wrap threads with teflon tape
a.
Check valve
22.
(page 4-1).
assembly (6)
Screw in and tighten using 1 1/16-inch
b.
wrench.
Wrap threads with teflon tape
a.
Elbow (7)
23.
(page 4-1).
b.  Screw in and tighten using 15/16-inch
wrench.
TA240439
4-673

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business