|
|
TM9-2320-270-20-2
WET RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
ASSEMBLY
NOTE
Do steps 33 thru 38 only if parts were disassembled for replacement.
a.
Secure tee (1) in vise.
Nipple (2)
33. Tee (1)
Wrap threads with teflon tape
b.
(page 4-1).
c.
Screw in.
a.
Wrap threads with teflon tape
Two elbows (3)
34.
(page 4-1).
Screw in and tighten using 15/16-inch
b.
wrench.
Take tee (1) out of vise.
c.
a.
Secure elbow (4) in vise.
Drain valve (5)
35. Elbow (4)
b.
Wrap threads with teflon tape
(page 4-1).
c. Screw in and tighten using 1 1/16-inch
box wrench.
d. Take elbow (4) out of vise.
Secure tee (6) in vise.
Adapter (7)
a.
36. Tee (6)
b.
Wrap threads with teflon tape
(page 4-1).
c.
Screw in and tighten using 11/16-inch
wrench.
Wrap threads with teflon tape
a.
Safety valve (8)
37.
(page 4-1).
Screw in and tighten using 3/4-inch
b.
wrench.
Wrap threads with teflon tape
38.
a.
Elbow (9)
(page 4-1).
b. Screw in and tighten using adjustable
wrench.
c. Take tee (6) out of vise.
Wrap threads with teflon tape
a.
Tee (1)
39. Wet reservoir (10)
(page 4-1).
Screw in and tighten using pipe wrench.
b.
4-664
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |