|
|
TM9-2320-270-20-2
NYLON TUBING - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
REPLACEMENT CONTINUED
Using 5/8-inch open-end wrench, unscrew
Nut (2)
6. Elbow (1)
and pull off.
Pull out.
Nylon tube (3)
7.
NOTE
Insert may stay in nylon tube or in elbow.
Pull out.
Insert (4)
8. Elbow (1) or
nylon tube (3)
Using 1/2-inch box wrench, socket, and
Two screws (7)
9. Two hose clips (5)
handle, unscrew part way.
and nuts (8)
to frame (6)
Take out.
Nylon tube (3)
10.
a. Slide back.
Nut (2)
11. Nylon tube (3)
b. Inspect for cracks and stripped
threads.
Inspect for deep grooves or cracks.
Sleeve (9)
12.
a. Inspect for cracks, bends, and being
Insert (4)
13.
crushed by sleeve (9).
b. Replace defective sleeve (9).
If nut (2) or sleeve (9) is defective:
Nylon tube (3)
14.
a. Using pocket knife, cut off
sleeve (9).
b. Get rid of old sleeve (9) and cut
off part of nylon tube (3).
c. Replace with new sleeve (9).
d. If nut (2) is damaged, slide off and
replace.
CAUTION
When installing nylon tubing under truck or in engine area, protect ends of tubing with
tape to prevent dirt from getting inside nylon tube and contaminating air and fluid
systems.
a. Seal ends with pressure sensitive
Nylon tube (3)
15.
tape.
b. Route into place.
4-636
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |