Click here to make tpub.com your Home Page

Page Title: CLEANING/lNSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
HIGH WATER TEMPERATURE SWITCH -CONTINUED
ACTION
LOCATION
ITEM
REMARKS
CLEANING/lNSPECTION
3.
High water tempera-
a.
Using wire brush, clean off old sealing
ture switch (1)
tape.
b.
Inspect switch for stripped or damaged
threads and cracks.
Replace damaged switch.
INSTALLATION
4. Thermostat
High water temper-
Wrap threads with teflon tape
a.
housing (7)
ature switch (1)
b.
Screw in and tighten using 7/6-inch
wrench.
Wire 320 (4), new
5. High water tempera-
Screw on and tighten using 3/8-inch
Iockwasher (3),
ture switch (1)
wrench.
washer (5),
insulator (6), and
nut (2)
NOTE
FOLLOW-ON MAINTENANCE:
1.
Fill cooling system (TM 9-2320-270-10).
2.
Install left hood side panel and close left side of hood (TM 9-2320-270-10).
TASK ENDS HERE
TA240074
4-419

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business