Click here to make tpub.com your Home Page

Page Title: INSTALLATION cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-1
FRONT TURN SIGNAL AND SIDE MARKER LIGHT ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
41. Leads (12) and (13)
New loom (15)
Put on.
42. Connector (16) on
Orange lead (12)
Push in until pin (18) is firmly locked.
wire 001 (17)
43. Connector (19) on
Blue lead (13)
Push in until pin (21) is firmly locked.
wire 012 (20)
44.
Leads (12) and (13)
Wrap with electrical tape.
and wires (17) and
(20) and connectors
(16) and (19)
NOTE
FOLLOW-ON MAINTENANCE: Check operation (TM 9-2320-270-10).
TASK ENDS HERE
TA240051
4-375

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business