Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-1
WORK LIGHT - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
Put in place.
Rear inner roof
44. C a b
panel (1)
Using number two cross-tip screwdriver,
Seven screws (2)
45. Rear inner roof
screw in and tighten.
panel (1) to cab
ALINEMENT
Turn on.
Work light
46. instrument panel (3)
switch (4)
Using 9/16-inch wrench, socket, exten-
Self-locking nut
47. Left work light (5),
sion, and handle, unscrew part way, then
(8) and bolt (9)
bowl bracket (6) to
tighten just enough so there is drag on
swivel (7)
bracket (6).
Turn right and left until light shines on
Bowl (10)
48.
winch instrument panel (11).
TA240025
4-340

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business