Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
FUEL GAGE - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
INSTALLATION
Put in.
Fuel gage (2)
Instrument panel (1)
10.
Put on.
Voltage adapter (3)
11.
Fuel gage (2)
Screw on and tighten using wrench.
Nut (4) and new
Fuel gage (2) to
12.
Iockwasher (5)
voltage adapter (3)
Nut (7) and new
Screw on and tighten using wrench.
13.
Sending unit termi-
Iockwasher (8)
nal (6) to voltage
adapter (3)
Put on.
Wire 318 (9) and
14.
Sending unit
new Iockwasher (10)
terminal (6)
Screw on and tighten using wrench.
Nut (11)
15.
Put on.
Differential lockout
16.
IGN terminal (12)
indicating light
wire (13), wire
--
078 (14), wire
405 (15), and new
lockwasher (16)
Screw on and tighten using wrench.
Nut (17)
17.
Push in.
Instrument panel
18. Fuel gage (2)
lamp (18)
TA239982
4-270

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business