Click here to make tpub.com your Home Page

Page Title: INSTALLATION cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
BATTERY GAGE VOLTMETER - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
Screw on and tighten using wrench.
Nut (16) and new
12.
lockwasher (17)
Screw on and tighten using wrench.
Nut (13) and new
13. Negative terminal
Iockwasher (14)
(9) to voltage
adapter (15)
Screw on and tighten using wrench.
Wire 232 (12), new
14. Negative
Iockwasher (11),
terminal (9)
and nut (10)
Screw on and tighten using wrench.
PTO auxiliary
15. Positive
throttle indicator
terminal (3)
light wire (7),
wire 074 (6), new
Iockwasher (5),
wire 113 (8), and
nut (4)
Push in.
Instrument panel
16. Battery gage (1)
lamp assembly (2)
NOTE
FOLLOW-ON MAINTENANCE: Check operation (TM 9-2320-270-10).
TASK ENDS HERE
TA239980
4-267

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business