|
|
TM 9-2320-270-20-1
RIGHT OR LEFT TURN SIGNAL INDICATOR LAMP ASSEMBLY - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Close instrument panel (page 4-244).
2. Check operation (TM 9-2320-270-10).
TASK ENDS HERE
OIL PRESSURE GAGE
This task covers:
a. Removal (page 4-280)
b. Installation (page 4-280)
INITIAL SETUP
Materials/Parts - Continued
Tools
Tag, marking (item 18, appendix C)
Wrench, open-end, 3/8-inch
Personnel Required
Materials/Parts
One
Lockwasher, wires to voltage adapter
IGN terminal
Equipment Condition
Lockwasher, voltage adapter to gage
(two required)
Lockwasher, wire to sending unit
Instrument panel open (page 2-244).
terminal
4-259
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |