Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
ETHER STARTING KIT - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
a. Put through panel (2).
Cable (3), new lock-
33. Firewall (1) and
b. Put on Iockwasher (4) and nut (5).
washer (4) and
panel (2)
c. Put through firewall (1).
nut (5)
Screw on and tighten using 9/16-inch
34. Cable (3) to
Nut (5)
wrench.
panel (2)
Instrument paneI
35.
Using slip-joint pliers, put in.
Cable (3)
36. Valve assembly (6)
Two screws (7)
Screw in and tighten against cable (3)
37. Cable (3) to valve
using screwdriver.
assembly (6)
Put on.
Mounting clamp (8)
38. Firewall (1)
Two screws (9) and
Screw in and tighten using 3/8-inch
39. Mounting clamp (8)
new Iockwashers (10)
to firewall (1)
wrench.
WARNING
Ether fumes are flammable, under pressure, and can explode. To avoid serious injury
or death, do not smoke, allow open flame nearby, or hit the ether cartridge with tools.
Ether cylinder (11)
Screw in and tighten.
40. Mounting clamp (8)
and valve
assembly (6)
Push close
Mounting clamp (8)
41. Firewall (1)
4-124

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business