|
|
TM 9-2320-270-20-1
TROUBLESHOOTING - CONTINUED
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 10.
Using multimeter set at 30 vdc, put red probe on terminal for wire no. 005 on
first switch (1) and black probe to good ground. While assistant applies brakes,
take the reading, then release brakes.
a. If meter reads no voltage, install jumper wire and replace first switch
b. If meter reads voltage, put wire no. 005 (5) back in place.
TA239678
3-91
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |