Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
TRANSMISSION SELECTOR LEVER AND SHIFT LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY AND INSTALLATION - CONTINUED
39.
New cotter pin (11)
a.
Put in position.
b.
Using angle-nose slip-joint pliers,
bend ends over.
40.
Bracket (3)
Clamp bar (12),
Put in position.
cable (5), and
cable clamp (13)
41.
Cable clamp (13)
Two screws (14), new
a.
Put in position.
b.
Screw in, and tighten using number
and nuts (16)
two cross-tip screwdriver and 3/8-
inch open-end wrench.
42.
Cable clamp (17)
Screw (18)
Unscrew and take out.
43.
Cable clamp (17)
a.
Put in position.
and screw (18)
b.
Screw in, and tighten using 1/2-inch
socket and ratchet handle with 1/2-
inch drive.
44.
Lever shaft (19)
Shift lever (10)
Put in position.
45.
Shift lever (10)
Nut (20)
Screw on, and tighten using 9/16-inch
socket and ratchet handle with 1/2-inch
drive
2-797

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business