Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
CONSOLE TACHOMETER AND OUTRIGGER HYDRAULIC SOLENOID WIRING HARNESS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
94.
Positive
Positive wire (2)
Route into position and push on.
terminal (1)
95
Outrigger
Wire (4)
a  Route through and up.
support (3)
b. Take off tag.
96
Wire (4)
Wire (5)
Connect (TM 9-2320-269-20-1).
97
Right rear
Two new tie
Put on.
emergency power
wraps (7)
switch (6)
98
Bracket (8)
Right rear emer-
Put in position
gency power
switch (6)
99
Right rear
Screw (9), ground
Screw in, and tighten using 3/16-inch
emergency power
wire (10), and
flat-tip screwdriver and 3/8-inch open-
switch (6)
nut (11)
end wrench.
100
Nut (12)
Screw on, and tighten.
101
Cap (13)
Push on.
TA238333
2-590

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business