Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
ETHER START CONTROL CABLE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
15.
Control cable (1)
Nut (2)
Screw on, and tighten using ball-peen
hammer and cold hand chisel.
16.
Control knob (3)
Put on.
17.
Control knob (3)
Setscrew (4)
Screw in, and tighten using 5/64-inch
socket head screw key.
18.
Control cable (1)
Control knob (3)
Push in all the way.
19 .
Firewall (5)
Control cable (1)
Put through.
20.
Fuel valve (6)
Control cable (1)
a. Put cable (1) in.
and screw (7)
b. Screw in screw (7) part way.
21.
Control cable (1)
Cable stop (8)
Put on.
22.
Cable stop (8)
Screw (9)
Screw in, and tighten using 7/16-inch
open-end wrench and 1/4-inch flat-tip
screwdriver.
23.
Fuel valve (6)
Control cable (1)
a. Pull cable (1) up until lever (10)
and screw (7)
touches rod (11).
b. Tighten screw (7) using 1/4-inch flat-
screwdriver.
TA238157
2-372

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business